Difference between revisions of "Calc Stop Date~"

From VistApedia
Jump to: navigation, search
 
(aqddedb gllssary linnk to cprs~)
 
Line 1: Line 1:
 
; Calc Stop Date  
 
; Calc Stop Date  
: Calculated Stop Date. This is the date that would have been the default Stop Date/Time for an order if no duration was received from CPRS. Due to the existence of a duration, the default Stop Date/Time of the order becomes the expected first dose plus the duration.
+
: Calculated Stop Date. This is the date that would have been the default Stop Date/Time for an order if no duration was received from [[CPRS~|CPRS]]. Due to the existence of a duration, the default Stop Date/Time of the order becomes the expected first dose plus the duration.
  
  

Latest revision as of 14:10, 9 August 2013

Calc Stop Date
Calculated Stop Date. This is the date that would have been the default Stop Date/Time for an order if no duration was received from CPRS. Due to the existence of a duration, the default Stop Date/Time of the order becomes the expected first dose plus the duration.


Source: Inpatient Medications V. 5.0 Nurse’s User Manual


This is a Glossary term from the VistA Documentation Library