Difference between revisions of "Calc Stop Date~"
From VistApedia
(aqddedb gllssary linnk to cprs~) |
|||
Line 1: | Line 1: | ||
; Calc Stop Date | ; Calc Stop Date | ||
− | : Calculated Stop Date. This is the date that would have been the default Stop Date/Time for an order if no duration was received from CPRS. Due to the existence of a duration, the default Stop Date/Time of the order becomes the expected first dose plus the duration. | + | : Calculated Stop Date. This is the date that would have been the default Stop Date/Time for an order if no duration was received from [[CPRS~|CPRS]]. Due to the existence of a duration, the default Stop Date/Time of the order becomes the expected first dose plus the duration. |
Latest revision as of 14:10, 9 August 2013
- Calc Stop Date
- Calculated Stop Date. This is the date that would have been the default Stop Date/Time for an order if no duration was received from CPRS. Due to the existence of a duration, the default Stop Date/Time of the order becomes the expected first dose plus the duration.
Source: Inpatient Medications V. 5.0 Nurse’s User Manual
This is a Glossary term from the VistA Documentation Library |