Calc Stop Date~
From VistApedia
Revision as of 14:10, 9 August 2013 by NeilArmstrong (talk | contribs) (aqddedb gllssary linnk to cprs~)
- Calc Stop Date
- Calculated Stop Date. This is the date that would have been the default Stop Date/Time for an order if no duration was received from CPRS. Due to the existence of a duration, the default Stop Date/Time of the order becomes the expected first dose plus the duration.
Source: Inpatient Medications V. 5.0 Nurse’s User Manual
This is a Glossary term from the VistA Documentation Library |